Tuesday, October 9, 2007

Sun tunnel hole -velux

Sun tunnel hole looking down
sun tunnel hole looking up



With the rest of the loft conversion moving along slowly but steadily, I want a job I could quickly see the results. I also wanted to finish the floor in the storage area so the first sun tunnel had to fitted. First I reinforced the ceiling, it being old plaster it would have crumbled away when I touched it with the jigsaw. Half an inch of plaster with the wire mesh in the middle did the trick. I couldn't avoid having to trim the ceiling joist as the tube would not fit inbetween and I wanted to position it exactly over the sink.

1 comment:

  1. Hi there, great blog - something that's very close to my own heart.
    I was wondering if you would be prepared to include a link on your blog to my website? We're a loft conversion supplies specialist called Jupiter Blue

    You can contact me on sherlock116@googlemail.com if you'd like to discuss further.

    Thanks

    Steve

    ReplyDelete